Page tree

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Since the Pre-Sim, Simulation, Post-Sim and Evaluation stages correspond to the completion of the respective checklists, these stages are only active/ enabled if there is at least one section with at least one item created within the checklist.

Image Added

For detailed information about preparing a checklist, click here.