Page tree

Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

SCE Scheduling in the SCE Management is a timing draft set up for a specific SCE. Once an SCE is selected for a scheduled event, that timing draft gets imported into the scheduled time interval.

Note

IMPORTANT: As a result of the connection, the following consequences should be taken into account:

  • the SCE Scheduling tab of the Edit Event pop-up contains no information until an SCE is assigned to the event on the Event Details tab
  • the duration of the scheduled event in the Calendar should be long enough to accommodate the duration of the Simulation Event as scheduled in the SCE Management

The timing draft, more specifically, the stages within the Pre- and Post-Event phases of the SCE can then be adjusted for a scheduled event on the SCE Scheduling tab of the Edit Event pop-up window in the Calendar module.

Note
IMPORTANT: The timing of the Simulation Event, including the activation of the automatic recording and setting up of intercom announcements, cannot be modified in the Edit Event pop-up, only in the SCE Management module.


Info
NOTE: The duration of the Simulation Event - but NOT the duration of the individual stages within - can be adjusted on the SCE Scheduling tab of the Edit Event pop-up.