IMPORTANT: The Calendar module is accessible to users with the following roles:
|
Scheduling an event is essentially determining a specific time interval for a group of learners to complete a simulation as described in detail within a specific SCE.
When scheduling within an Activity, the events will be linked/grouped. |
NOTE: Scheduling an event is possible in the Day or Week views of the Calendar module. Scheduling an event is also possible in the Month view, by double-clicking in the field of the respective day. |
User Manager: The participant groups desired to be scheduled (including the intended users) need to be set up in the User Manager.
SCE Management: The simulation content (the SCE intended for the scenario) is built up in the SCE Management, with special attention to the SCE Scheduling part of the SCE.
IMPORTANT: Automatic recording can be set up for the Briefing, Simulation and Debriefing parts of a scheduled event. For the recording to start, the camera icon has to be activated within the SCE Scheduling part of the SCE Management. |
Adding an Activity
Select the type of the Activity from the drop-down.
The types of Activity are color-coded and can be filtered for in each calendar view. |
A new Activity can be added via the Edit Event pop-up as well, by clicking and thus expanding the Add New Activity function. |
Adding an Event
Click and drag the cursor through the time interval you intend to schedule for the event.
NOTE: When scheduling in Day view, make sure that the time interval is determined in the line of the desired room. When scheduling in Week view, the room can be selected via the Room drop-down at the top of the pop-up window. When scheduling in Month view, double-click in the field of the respective day to open the Edit Event pop-up window. |
The Edit Event pop-up window opens where all specifications can be given for the event.
By default, a newly added event is entitled "New Event".
To avoid confusion and ensure proper distinction, make sure to enter a specific title for your event.
Select the SCE intended to be performed.
Switch to the Participants tab of the pop-up and add the desired participant groups using the corresponding tabs and drop-downs.
On the SCE Scheduling tab, modify the stages of the Pre- and Post-Simulation if necessary, or adjust the duration of the Simulation.
Modifications on an SCE affect previously created Events. |
IMPORTANT: The most exact scheduling of the event can be determined via the editable time fields of the SCE Scheduling tab of the Edit Event pop-up. |
Click Save to conclude the event scheduling.
For further information, visit our Calendar Module and Calendar - FAQ pages. |