Page tree

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

How to Make Time and Date Adjustments

  • Access the Calendar module and select a desired view.
  • In Day or Week view, drag the right or the bottom side of the event respectively to change the ending time, hence the length, of the event.

IMPORTANT: In case of repeated events, a message appears confirming whether the modification should be applied to only the specific event or all the repetitions as well.
Confirmation window

  • In either view, drag and drop the event to the time spot desired to change the starting time of the event, with the length unaffected.


Drag and drop in Day view
NOTE: In Day view, dragging is only possible horizontally (vertical movement would involve changing room).
Drag and drop in Week view
IMPORTANT: The drag and drop motion is only possible within the displayed time set, that is, the view. Consequently, in Day view, only the time can be changed, in Week view, time and date within the given week, while in Month view, time and date can be changed to any point of the month.

  • No labels