Process Flow
Adding an Activity
- If your activity has not yet been created, click the Activities button in the top right corner of the calendar.
The Activities pop-up will open. - Type the title of the activity in the corresponding field.
Select the type of the activity from the drop-down.
NOTE: The types of activity are color-coded and can be filtered for in each calendar view.- Once the activity is saved, you can proceed with the event scheduling.
Adding an Event
- In the selected calendar view, display the day - the date of the event.
Click and drag the cursor through the time interval you intend to schedule for the event.
NOTE: When scheduling in Day view, make sure that the time interval is determined in the line of the desired room.
When scheduling in Week view, the room can be selected via the Room drop-down at the top of the pop-up window.
When scheduling in Month view, double-click in the field of the respective day to open the Edit Event pop-up window.The Edit Event pop-up window opens where all specifications can be given for the event.
By default, a newly added event is entitled "New Event".
To avoid confusion and ensure proper distinction, make sure to enter a specific title for your event.Select the SCE intended to be performed.
Switch to the Participants tab of the pop-up and add the desired participant groups using the corresponding tabs and drop-downs.
On the SCE Scheduling tab, modify the stages of the Pre- and Post-Simulation if necessary, or adjust the duration of the Simulation.
Modifications on an SCE do not affect previously created Events. This means that, modifications only come into force once the Event has been updated with the modified SCE meaning that the SCE has been re-added to the Event.
IMPORTANT: The most exact scheduling of the event can be determined via the editable time fields of the SCE Scheduling tab of the Edit Event pop-up.Click Save to conclude the event scheduling.
For further information, visit our Calendar Module and Calendar - FAQ pages.