Activity schedules are broken into Events. AnEventis aperiod of timewhenstation setup and SP assignmentsare the same. This means that throughout the Event, thesame Case(s) with thesame SP(s)run(s) in thesame room(s). Events can be set up within theCalendaror in Advanced Scheduling. → SeeHow to Understand Concepts within Advanced Scheduling.
And CAE LearningSpace has much more for you.
Check out all details on the following Help site pages: