Versions Compared
Key
- This line was added.
- This line was removed.
- Formatting was changed.
Note |
---|
Advanced Scheduling provides means for pre-programming events such as:
Users with the necessary privilege (Admin,SRP (full control) or SRP) can schedule specific events within an Activity
|
Info | ||
---|---|---|
| ||
For Advanced Scheduling, the following concepts are necessary to understand: |
Concept | Description | Related Help site pages | ||
---|---|---|---|---|
Events | Activity schedules are broken into Events. An event is a period of time when station setup and SP assignments are the same. This means that throughout the event,
| |||
Rounds | A Round is a period of time for which students sign up:
If the round setup is not valid, an error message displays at the top of the scheduling page and changes cannot be saved. Image Modified | |||
Timeslots | Timeslots are smallest time units within an event. During a timeslot, one or more assigned learners need to complete one Case with the help of an SP or a simulator. There are two different types of Timeslots:
Consecutive timeslots make up Rounds. Besides its length, a timeslot also has a time after property. | |||
Stations | A station is a room running a specific Case for a specific event of an Activity. | |||
Spots | Spots are the maximum number of available spaces for students to participate within a specific round.
|
Group size | Specifies the number of learners participating in an encounter at the same station at the same time. | |
Rotation scheme |
| How to Choose Group Size and Rotation Scheme |
Tip |
---|
For further information, visit our Advanced Scheduling pages, and view our Activity Manager Training Videos. |